Version 2.1.52 / TOS 5.1.34

After the recent partition issues I restored the system to default giving me 8gb, after all the issues I not backup to USB using USB copy. I have a few tasks set up:

TNAS to USB / Mirror / Scheduled Tasks enabled > Everyday @ 03:00

However after a reset the tasks page shows my created tasks (5 backup folders in total) and the details but the field "Next Run" is blank, just says "---". The time then passes, have left extra time due to a time mismatch which I have already reported and it does not back up. I run manually and it works but does not run when specified. I tried to removed and re-add the task however the issue not only reoccurs but overwrites the whole backup, not just reflecting the changes. I have some large folders so can take several hours doing this.

Why does this not run as a scheduled task when its supposed to?
Setup:
System: F2-422
OS: TOS 6.0.535
HD: x2 IronWolf 6TB (RAID 0)
Notes: 8GB System Partition!

Backup:
USB COPY: Seagate 8GB External Expansion HDD
User avatar
TMroy
TM Support
Posts: 3060
Joined: 10 Mar 2020, 14:04
China

Re: Scheduled task not running

Post by TMroy »

This issue has been verified. A new version of USB Copy will be released to fix the issue soon.
To contact our team, please send email to following addresses, remember to replace (at) with @:
Support team: support(at)terra-master.com (for technical support only)
Service team: service(at)terra-master.com (for purchasing, return, replacement, RMA service)
User avatar
gaz2k1uk
Posts: 12
Joined: 30 Nov 2022, 22:02
Great Britain

Re: Scheduled task not running

Post by gaz2k1uk »

Thanks, do we know when this release will be pushed?
Setup:
System: F2-422
OS: TOS 6.0.535
HD: x2 IronWolf 6TB (RAID 0)
Notes: 8GB System Partition!

Backup:
USB COPY: Seagate 8GB External Expansion HDD
User avatar
TMroy
TM Support
Posts: 3060
Joined: 10 Mar 2020, 14:04
China

Re: Scheduled task not running

Post by TMroy »

Could be in one or two weeks.
To contact our team, please send email to following addresses, remember to replace (at) with @:
Support team: support(at)terra-master.com (for technical support only)
Service team: service(at)terra-master.com (for purchasing, return, replacement, RMA service)
User avatar
sianderson
Silver Member
Posts: 417
Joined: 02 Aug 2020, 03:42
Great Britain

Re: Scheduled task not running

Post by sianderson »

TMroy wrote: 27 May 2023, 12:06 Could be in one or two weeks.
well given the current time frame of waiting for an update to the time issue, thats a rather optimistic view
F2-424 TOS 7.0.0765
F2-423 TOS 7.0.0765
F2-210 TOS 4.2.44
D4-320

C/O
F4-424 TOS 6.0.794
User avatar
Gremlin
Gold Member
Posts: 1627
Joined: 02 Dec 2022, 22:31
Great Britain

Re: Scheduled task not running

Post by Gremlin »

Grateful if someone could clarify if this is an issue with "Scheduled Tasks" (as defined in control panel) or tasks set in "USB Copy". Is there a difference?
F5-221 TOS7.0.0777 - 4x4TB (Ironwolf) Traid
F2-424 TOS7.0.0777 - 2x500GB nvme (P3) Traid, 2x6TB HDD (HGST) Traid
F2-221 TOS7.0.0777 - 1x3TB Ext4, 1x4TB Btrfs
F2-425+ TOS7.0.0777 - 2x500GB nvme (P3) Traid, 2x6TB HDD (EXOS) Traid
User avatar
titanrx8
Posts: 225
Joined: 17 Jul 2020, 06:17
United States of America

Re: Scheduled task not running

Post by titanrx8 »

Gremlin wrote: 27 May 2023, 17:47 Grateful if someone could clarify if this is an issue with "Scheduled Tasks" (as defined in control panel) or tasks set in "USB Copy". Is there a difference?
My scheduled USB copies thru the USB Copy utility have not been happening as scheduled (everyday at 6pm). I've been using incremental. When I run the team manually it works properly.

I have not tried setting this thru the Scheduled Tasks utility. (I was surprised that setting the task in USB Copy didn't create a task in the Scheduled Tasks utility. That would have been the logical place for it to have visibility.
User avatar
Gremlin
Gold Member
Posts: 1627
Joined: 02 Dec 2022, 22:31
Great Britain

Re: Scheduled task not running

Post by Gremlin »

titanrx8 wrote: 27 May 2023, 21:18
(I was surprised that setting the task in USB Copy didn't create a task in the Scheduled Tasks utility. That would have been the logical place for it to have visibility.
Exactly.
Since I was having trouble with USB Copy anyway, not much sense in me pursuing it until this issue is resolved.
Thanks
F5-221 TOS7.0.0777 - 4x4TB (Ironwolf) Traid
F2-424 TOS7.0.0777 - 2x500GB nvme (P3) Traid, 2x6TB HDD (HGST) Traid
F2-221 TOS7.0.0777 - 1x3TB Ext4, 1x4TB Btrfs
F2-425+ TOS7.0.0777 - 2x500GB nvme (P3) Traid, 2x6TB HDD (EXOS) Traid
User avatar
gaz2k1uk
Posts: 12
Joined: 30 Nov 2022, 22:02
Great Britain

Re: Scheduled task not running

Post by gaz2k1uk »

{L_BUTTON_AT}TMroy

Hi, Any new on when the update will be pushed?
Setup:
System: F2-422
OS: TOS 6.0.535
HD: x2 IronWolf 6TB (RAID 0)
Notes: 8GB System Partition!

Backup:
USB COPY: Seagate 8GB External Expansion HDD
User avatar
mithito
Posts: 5
Joined: 12 Mar 2023, 04:50

Re: Scheduled task not running

Post by mithito »

There is an update (v2.0.160) and something has changed but it shows the programmed "Next run" for tasks that were already configured on a past date. And it does not look like it is triggering my daily tasks. I tried manually runing them to see if the "Next run" field updates but it keeps showing same date in the past. I'll wait and check if the process is trigerred and field updated during this night at the programmed hour but I suspect they will not. And I'll try creating new tasks, but this is something I do not want to do because it will be a terrible fix if we have to re-do all our tasks to have them working again.